Walk-In Tubs — Safe, Spa-Level Comfort
Our walk-in tubs come fully loaded—no add-ons needed. You get a low step-in, non-slip floor, ADA-height seat, integrated grab bars, a leak-tight door, and a handheld shower with anti-scald control. Every tub includes hydrotherapy water jets, air-massage injectors, a heated backrest, inline temperature heater, aromatherapy infuser, and chromotherapy LED lighting, plus fast-fill / fast-drain valves and ozone/UV sanitation for fresh, clean water.
Installed to code by our in-house crew and sealed with antimicrobial sealants to help resist mold and mildew (with proper ventilation). Backed by our lifetime workmanship warranty and manufacturer warranties on the tub and components.
Full Bathroom Transformations — Down to the Studs
We demo to the studs and rebuild the right way—by our in-house crew—with code-correct plumbing/electrical and full waterproofing. Choose a custom shower pan (up to 5.5 ft, multiple colors, foam-injected) with acrylic/composite surrounds or tile. Most projects finish in 2–7 days and include a lifetime workmanship warranty; we handle permits and inspections.
Bathroom Refresh
eep your layout, upgrade everything. Our in-house crew swaps in a new vanity, faucet, toilet, lighting, fan, flooring, paint, and a fresh wet area with acrylic/composite surrounds or tile—plus the option for a custom shower pan up to 5.5 ft (multiple colors, foam-injected, thicker than standard). Minimal demo, clean jobsite, code-correct connections, and proper waterproofing where it matters. Typically finished in 2–5 days and backed by our lifetime workmanship warranty; permits handled if needed.
Wet Area Refresh — Shower/Tub Upgrade
Upgrade just the shower/tub area while keeping the rest of your bathroom. We install a custom shower pan up to 5.5 ft (multiple colors, foam-injected, thicker than standard), add a new wall system (acrylic/composite panels or tile), replace the valve/trim and fixtures, and properly waterproof with code-correct plumbing. Minimal demo, clean jobsite, optional glass door. Typically finished in 1–3 days and backed by our lifetime workmanship warranty.